Began production of a back axis. I pasted a back axis to springs. Behind that I drilled an opening through an axis and a spring and spring the cotter pin with glue. Behind that I made imitation of fastening of a spring to an axis. Also began production of fastening of the shock-absorber to an axis. Meanwhile all this, is… Read more »
Pasted a front axis to springs also strengthened pins. Behind that separated this design from a frame, finished additional details and prepared for painting. At first painted with soil paint. And finally yellow. The front axis is ready.
There is no time. At the moment made a front axis. Began with strengthening of a rotary system and made a pulley. Made management of a front axis.