Production of a wheel of management. For production of a wheel I used the telescopic antenna from the radio receiver. A core as a wheel and tubes for production of holders of a wheel. I have made the top part of a wheel on hinged connection.
The top holder I has inserted in has spent on drink a piece of a tube and has bent inside.
I have turned the handle from a tree and I have inserted into the drilled wheel opening.
The lower holder has made of a strip of brass which he has bent and has soldered to a tube. After that I cut off the necessary length of a tube and ink. In the lower part of a wheel I have soldered the lever of draft and too I blackened.
Wheel assembled.
Well and actually installation of a wheel. At first on glue the top holder, has assigned to that lower. I have fixed everything by carnations.
Behind that I have made draft of a brass bar and I have fixed it on a forward axis. After that I have pasted a forward axis to springs and I have fixed the second part of the lever with the wheel lever. Generally the wheel is ready.